The buyer's checklist

By Mike YuPublished September 1, 2026

About your place

  • I know which way the spot faces, and it isn't north. Check
  • I can see a wide arc of open sky from there for most of the middle of the day.
  • There's an outdoor outlet within cord reach, with a cover that closes on a plug. Check
  • I know what else is on that circuit and it isn't a heater or an air conditioner.
  • The railing, wall or floor can take 40 to 60 pounds and I won't damage it mounting to it.
  • I've read my lease's alterations clause, or my HOA's architectural rules.
  • I've asked, in writing, if I need to. Letter generator
  • I know roughly what my electricity costs per kilowatt-hour. Find out
  • I know whether anyone's home during the day, and I've been honest about it.
  • I've run the numbers and I'm comfortable with the answer. Calculator

About the kit

  • Total AC output across everything at this address is 1,200 watts or less.
  • The manufacturer names a specific certification, not "certified components." Checker
  • Documentation says it has anti-islanding, or shuts down in an outage.
  • It's sold by a US seller with US documentation, not imported from Europe.
  • I know what mounting hardware is included and what isn't.
  • I've bought clamps that fit my actual railing shape.
  • I've budgeted for a tilt bracket if the panel would otherwise hang vertical.
  • I know the warranty on the panel and, separately, on the microinverter.
  • I know whether there's an app or whether I need a plug-in energy meter.
  • I've checked the return policy, in case the balcony turns out to be worse than I thought.

The day it arrives

  • Photograph the railing before mounting anything.
  • Unbox and check for shipping damage before you're forty feet up a stairwell with it.
  • Mount before plugging in. Never the reverse.
  • Check the clamps are tight, then check again a week later.
  • Plug in and confirm it's producing — via the app, or a plug-in meter.
  • Photograph the installed panel and email it to your landlord or board if you promised to.
  • Add it to your renter's or HO-6 policy.
  • Note the date and the reading. Everything interesting comes from comparing that against later readings.
  • Register with your utility if they've asked for it. Current requirement